SkyJacks was privileged to be contracted by Tri-Star Construction to provide them with an access solution for the repair work that needed to be done on the 7th floor of the prestigious Marriott Hotel, Melrose Arch. A 240m track system was installed in just over a week that enabled the contractors to safely access all the facades that needed to be repaired.